The ISO/IEC 42001 Management system (clauses 4–10) domain has 24 controls. This page lists every one, in plain language, with what it asks of you and the kind of evidence that actually satisfies it. The international standard for AI management systems (AIMS).
By Aneis Samaan, founder of CyberSentien · Last updated November 2026 · Sourced from the ISO/IEC 42001 control set.
These 24 controls are the Management system (clauses 4–10) slice of ISO/IEC 42001. Read them as the questions an assessor will ask, and the artefacts you will be asked to produce for each. Below every control we keep the language of the source; the value we add is turning each into an evidence question you can answer honestly.
| Control | What it requires |
|---|---|
4.1 | Understanding the organisation and its context Determine external and internal issues relevant to the AI management system (AIMS) and its intended outcomes; the organisation's role as AI provider, developer or user. |
4.2 | Needs and expectations of interested parties Identify interested parties relevant to the AIMS and their requirements, including legal, regulatory, ethical and contractual obligations for AI. |
4.3 | Determining the scope of the AIMS Determine and document the boundaries and applicability of the AI management system; scope covering AI systems, roles and interfaces. |
4.4 | AI management system Establish, implement, maintain and continually improve the AIMS and its processes in accordance with the standard. |
5.1 | Leadership and commitment Top management demonstrates leadership and commitment to the AIMS; AI policy and objectives set, resources provided, responsible-AI culture promoted. |
5.2 | AI policy Top management establishes an AI policy appropriate to the organisation, aligned to values and obligations, communicated and documented. |
5.3 | Roles, responsibilities and authorities Assign and communicate responsibilities and authorities for roles relevant to the AI management system. |
6.1 | Actions to address risks and opportunities Plan actions to address AIMS risks and opportunities; AI risk assessment and risk treatment, Statement of Applicability, AI risk register. |
6.2 | AI objectives and planning Establish measurable AI objectives at relevant functions and levels and plan how to achieve them. |
6.3 | Planning of changes Changes to the AIMS are carried out in a planned manner. |
7.1 | Resources Determine and provide the resources needed for the AIMS, including data, tooling, compute and people. |
7.2 | Competence Determine, ensure and evidence the competence of persons doing work affecting AI performance; AI skills and training records. |
7.3 | Awareness Persons are aware of the AI policy, their contribution to the AIMS and the implications of not conforming. |
7.4 | Communication Determine internal and external communications relevant to the AIMS — what, when, with whom and how. |
7.5 | Documented information Create, update and control the documented information required by the AIMS and the standard; document control, retention. |
8.1 | Operational planning and control Plan, implement and control the processes needed to meet AIMS requirements and implement the risk treatment and impact-assessment actions. |
8.2 | AI risk assessment Perform AI risk assessments at planned intervals and when significant changes occur, retaining documented results. |
8.3 | AI risk treatment Implement the AI risk treatment plan and retain documented information of the results. |
8.4 | AI system impact assessment Perform and document assessments of the impacts of AI systems on individuals, groups and society throughout the lifecycle. |
9.1 | Monitoring, measurement, analysis and evaluation Monitor, measure, analyse and evaluate AI performance and the effectiveness of the AIMS; metrics, model monitoring, drift detection. |
9.2 | Internal audit Conduct internal audits at planned intervals to confirm the AIMS conforms and is effectively implemented; AI internal audit report. |
9.3 | Management review Top management reviews the AIMS at planned intervals for continuing suitability, adequacy and effectiveness; management review pack. |
10.1 | Continual improvement Continually improve the suitability, adequacy and effectiveness of the AIMS. |
10.2 | Nonconformity and corrective action React to nonconformities, take corrective action, and retain documented information; nonconformity register, corrective action plan. |
The failure mode is the same in every framework: a control marked ‘compliant’ with nothing behind it. An assertion is not evidence. For each control above, the honest test is whether you can point to a dated, specific artefact — a configuration export, a log extract, a signed policy, a register entry — not a claim that you ‘do that’. That is exactly what CyberSentien enforces: a control with no evidence reads manual assessment required, never a fabricated pass. How the engine assesses →
You do not answer to one framework in isolation. The same body of evidence maps across everything you are accountable to — which is the whole point of assessing once against real evidence and reporting everywhere. Related on this site:
There are 24 controls in this domain of ISO/IEC 42001. They are all listed above with what each requires.
Evidence is specific and dated: configuration exports, logs, signed policies, register entries and test results tied to the control, not a written assertion that the control exists. CyberSentien refuses to mark a control compliant without that lineage.
Yes. ISO/IEC 42001 is one of the frameworks live on the CyberSentien engine, assessed against your real evidence with honest coverage and tamper-evident report lineage.
Every capability referenced on this page is live on the CyberSentien engine — see it on the always-live gated demo. Nothing on this page is legal advice.