Banks, APRA-regulated, government & rail

Rail & OT

A rail project carries IEC 62443 and CLC/TS 50701 obligations across every zone and conduit, and the evidence sits in OT monitoring tools, asset registers and engineering spreadsheets. Assembling it for a safety board or an assessor takes weeks of consultant time, and it is out of date the day it is finished.

Customers work in their own workspace at rail.cybersentien.com, prepared when the subscription starts. The try-out runs on sample data.

IEC 62443 zones and conduits · CLC/TS 50701 traceability · evidence from your OT monitoring

What you get

OT compliance evidence from the tools you already run: IEC 62443-3-3 checks per zone, a CLC/TS 50701 traceability matrix and decks for the safety board.

Defensible results, with less consultant overhead.

AI you can check

It never makes or changes a safety decision. It reads settings and documents, read-only. Every result shows its quoted passage or the live setting, and anything unsure goes to a person.

How we keep the AI honest →

The five checks, zone by zone

Export from Nozomi Networks Guardian, Claroty, Dragos Platform or Tenable OT Security. The engine reads assets with firmware and zone, vulnerabilities, alerts and connections, and works out five checks per zone.

CheckCreditsWhat it reads
Asset inventory completenessIEC 62443-3-3 SR 7.8the asset export against the zone model
Connections against the conduit rulesSR 5.1, SR 5.2observed flows against the allowed conduits (finds Telnet and unapproved SSH)
Monitoring coverageSR 6.2alert exports per zone; a file missing a severity column is refused and says so
Firmware currencynone, by designfirmware against the engineer-maintained baseline (patch management is IEC 62443-2-3)
Vulnerabilities against each zone's target security levelnone, by designopen findings against the level set under IEC 62443-3-2

What the console gives you: zones and conduits, a requirements traceability matrix with a telemetry column and an Excel export, and decks for the safety board.

Catalogues on the engine:

IEC 62443-3-3 · 51 controlsIEC 62443-3-2 · 27 controlsIEC 62443-4-2 · 55 controlsCLC/TS 50701 · 33 controls

Frameworks covered

Each framework links to its own page.

What it covers today

The engine reads the exports your OT monitoring platform already produces (CSV import today; no API connector yet) and works out five checks per zone. Each result says met, not met or not measured, and names the reason down to the row and file it came from. A check is met only when every zone it covers is met, and column maps are confirmed against your real export during the pilot. Document evidence is shown as candidate evidence for assessor review.

Pricing

Pilot $9,950 for 90 days, then $3,950 a month per rail project.

Prices in AUD.

Pilot · $9,950

90 days on one rail project, credited against the first year's subscription.

  • One rail project set up in the Rail & OT console
  • Your OT monitoring exports read zone by zone against the five checks
  • A CLC/TS 50701 requirements traceability matrix with an Excel export
  • Decks for the safety board
Start a pilot →

Subscription

$3,950 a month or $39,500 a year, per rail project.

Reports

IEC 62443-3-2 report$1,450 each
CLC/TS 50701 report$1,450 each
IEC 62443-3-3 report$2,050 each
IEC 62443-4-2 report$2,050 each

See all pricing →

Your workspace

Try it on the shared demo today. When you subscribe, your organisation moves to its own workspace at rail.cybersentien.com, hosted in Australia and separate from the demo and from every other customer.

See it working

Open the console on sample documents now, or tell us where you sit and we'll send a personal demo link for your own evidence.

Try the Rail & OT console →Request a demo